Graph Overlapping

Graph overlapping is used to compare different results on a single graph. 
For example, graph overlapping can be used to compare the Virtual users Ramp-up and Timer values, the Virtual users Ramp-up, the number of Hits per seconds, and compare results from different jobs.

  1. Create a new graph or display an existing one
  2. Select a new graph from the  Repository tab, drag and drop it into the current graph.

 

On the graph below, the number of Hits (Left Y axis) can easily be compared with the number of active users (right Y axis).

 





Go back to the Learning center:


Copyright © AgileLoad. All rights reserved.
Agile Load testing tool| Contact AgileLoad | Terms of Use | Sitemap